Surveyors.io

ALTA Survey Requirements in 2026

Jun 28, 2026 · 9 min read

Surveyor matcher

Traverse

3 matched · licensed in · near

Free for clients · You choose who to talk to

An ALTA survey is governed by a single national document: the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly adopted by the American Land Title Association and the National Society of Professional Surveyors. If your commercial closing requires "an ALTA," this standard is the entire contract between you, the surveyor and the title insurer. Here is what it obligates, and where the price actually comes from.

What every ALTA survey must include

  • Boundary resolution per the record title commitment, with monuments found or set at corners.
  • All Schedule B-II exceptions plotted. Every recorded easement and encumbrance in the title commitment that can be shown, shown, or noted as not plottable.
  • Improvements, access and encroachments. Buildings, visible utilities, means of access, and anything crossing a line in either direction.
  • The prescribed certification. Verbatim language certifying to the buyer, lender and title company, naming the effective standard.

These minimums are not negotiable, which is why "just a cheap ALTA" is not a coherent request. The negotiation lives in Table A.

Table A: where scope and price are set

Table A is a menu of optional items the parties elect. The items your lender checks are the items you pay for:

ItemWhat it addsCost impact
1Monuments set at cornersLow
2Site address notedNone
3Flood zone classificationLow
4Gross land areaLow
5Vertical relief / topographyHigh - it embeds a topo survey
6Zoning (from a provided report)Medium, plus the zoning report fee
7Exterior building dimensionsLow-medium
8Substantial visible featuresLow
9Parking count and stripingLow-medium
10Party wallsMedium
11Utilities (visible and/or from plans/markings)High - 11(b) with utility locate is real fieldwork
13Adjoining owner namesLow
16-18Earth moving, changes, wetlands observationsVaries
19Professional liability insurance evidenceNone

A pad-site ALTA with items 2, 3, 4, 8 quotes very differently from the same site with 5, 6, 9 and 11(b). This is why scoped requests get comparable bids and vague requests get padded ones. Typical 2026 pricing: $2,500 to $4,500 for simple pad sites, $4,000 to $7,500 mid-size, $7,000 to $10,000+ for large or heavy-scope sites.

The schedule reality deal teams miss

The survey needs the title commitment (the surveyor plots Schedule B-II from it), so ordering the ALTA the day the commitment lands, not the week before closing, is the single best schedule move. Field-to-seal runs 2 to 4 weeks in most markets, and crew availability, not fieldwork hours, is the variable. A late survey is a late closing; three scheduled quotes protect the date better than one incumbent's promise.

Scoping checklist

  • Site address, parcel(s), acreage, and current title commitment (or its ETA)
  • Lender's required Table A items (ask; they have a standard list)
  • Certification parties, exactly as they will appear
  • Closing date, worked backward to a required delivery date

Bring that list to the matcher on our homepage and matched, license-verified surveyors in the property's state return comparable ALTA quotes with real crew dates, typically within 24 hours. For the wider pricing picture across survey types, see the land survey cost guide.

Need it done right? Compare up to 3 quotes from licensed, insured land surveyors near you, usually within 24 hours. Free for clients.

Get matched quotes