Surveyors.io

Subsurface utility engineering services and SUE surveying for site design

Subsurface utility engineering (SUE) maps what is buried under a site and states how reliable each line is, using the four quality levels of ASCE 38-22: records (QL-D), visible features (QL-C), geophysical designating (QL-B) and exposed test holes (QL-A). Developers, civil engineers and public owners order it before design so pipes and cables are drawn where they really are, not where an old record put them. A federal study of 71 projects found $4.62 saved for every $1 spent on SUE. Post the job once and request quotes from surveying firms that do SUE in your county.

Scoped requests · free for clients Published for surveyors who join in your county

Surveyor matcher

The price range and turnaround for the job you describe appear here.

Traverse

Estimate for ,

typical local range · on site to drawing

A published range for this type of work, not a quote. Send the request and it is published; surveyors who join in your county can price it, and no number of quotes or date is promised.

Free for clients · You choose who to talk to

Scope

Who buys subsurface utility engineering and what they get

SUE is bought by the people who pay when a buried line is in the wrong place on the plans: a developer about to grade a pad site, a civil engineer designing storm and sewer runs, a school district adding a building on a crowded campus, a municipality widening a road. The common thread is that design is about to commit money to a layout, and a conflict found during excavation costs far more than one found on paper.

The deliverable is a utility map, usually drawn into the same CAD base as the topographic survey, where every line carries a quality level. A water main shown as QL-B was traced in the field with electromagnetic locators or ground penetrating radar. The same main shown as QL-A at three points was exposed in test holes, so its depth, size and material at those points are measured facts. The designer can see at a glance which lines are safe to design around and which still need checking.

This is different from the free public locate you get by calling 811. The 811 system exists so excavators can dig safely: member utilities paint their own lines before a dig, the marks are temporary, and private lines owned by the property are not part of it. SUE is a design survey. It is mapped, tied to the project coordinates and kept, so the same information carries from design through bidding to construction.

ASCE 38-22

The four SUE quality levels and when to order each

The national standard is ASCE 38-22, the 2022 revision of the guideline the Federal Highway Administration has promoted for decades. Naming the level in your scope is what makes three SUE quotes comparable.

The four SUE quality levels and when to order each
Level How the information is obtained Order it when
QL-D Existing utility records and oral recollections, compiled and plotted Early feasibility, to see which utilities exist and who owns them
QL-C Surveying visible features such as valves, manholes, poles and meters, then correlating them with the records Concept design on sites with little underground conflict expected
QL-B Surface geophysics (electromagnetic locating, ground penetrating radar) to find and mark the horizontal path, then surveying the marks Design on any site where new work crosses or runs near existing lines
QL-A Exposing the utility in a small test hole, usually by vacuum excavation, and measuring its horizontal and vertical position At the points where a proposed pipe, footing or bore actually conflicts

Definitions follow the FHWA subsurface utility engineering summary. A normal existing conditions survey by a land surveyor usually stops at QL-C. Most projects need QL-B across the work area and QL-A only at the handful of conflict points, which is where the money is saved. Day rates for the radar part of QL-B work are in our GPR survey cost guide.

Return

Why owners pay for SUE when 811 is free

The best evidence is old but still the reference point. The Federal Highway Administration commissioned Purdue University to study 71 projects in North Carolina, Ohio, Texas and Virginia with a combined construction value over $1 billion. The study found $4.62 in savings for every $1.00 spent on SUE. Quality level B and A data cost about 0.5 percent of total construction cost, and produced savings of about 1.9 percent. The FHWA keeps the summary on its Purdue SUE study page.

The savings come from three places. Fewer redesigns, because the layout is drawn around real positions. Fewer change orders and delays, because the contractor does not find an unmarked duct bank halfway through a trench. And fewer utility strikes, which on a gas or fiber line can stop a job for days and bring a repair bill and a claim with them.

For a private site the same logic holds at a smaller scale. A $4 million commercial pad site that budgets 0.5 percent for SUE spends about $20,000. One relocated storm line, one redesigned footing or one week of a crew standing idle can cost that by itself. That is a planning benchmark derived from the federal ratio, not a quote: the real price depends on the site, as the next table shows.

Cost

What subsurface utility engineering costs depends on these factors

SUE firms price by crew days for designating, a unit price per test hole, and office time for the map. These are the lines that move the total.

What subsurface utility engineering costs depends on these factors
Factor Why it changes the price How to keep it down
Area and linear feet QL-B designating is walked line by line, so a long corridor or a large campus adds crew days Draw the limit of work tightly around the area being designed
Utility density Downtown blocks and old campuses have stacked, abandoned and unrecorded lines that take longer to separate Hand over every record you have so the crew is not rediscovering them
Non-metallic pipe Plastic water and sewer lines without tracer wire are invisible to electromagnetic locators and need radar or other methods Say which utilities matter most to the design
Number of test holes Each QL-A hole is a separate excavation with traffic control, restoration and a data sheet Order QL-A only where a proposed feature crosses or nears an existing line
Traffic and access Work in a road needs a lane closure plan and permits, night work costs more Schedule test holes together and share the traffic control
Deliverable A sealed utility plan merged into the design CAD file takes more office time than marks on the ground Ask for the CAD format and coordinate system your engineer uses

Ask each firm to quote QL-B by the day or by the linear foot and QL-A per hole, as separate lines. Three quotes on that basis can be compared directly. For a single residential lot where you only need private lines marked before digging, the private utility locating cost guide is the better fit and much cheaper.

Process

How an SUE investigation runs from request to sealed utility map

1.

Post the job once

Give the site, the limit of work, the design stage and the quality level you think you need. As they become available, surveying firms that offer SUE in your county reply with quotes.

2.

Records research (QL-D)

The firm collects utility owner records, as-builts and prior surveys, and lists every owner that may have facilities on site.

3.

Field survey (QL-C and QL-B)

The crew surveys visible features, then designates buried lines with locators and radar and surveys the paint marks into the project coordinates.

4.

Test holes (QL-A)

At the conflict points the engineer picks, the crew vacuum excavates small holes and records depth, size, material and condition.

5.

Utility map

Every line goes into the CAD base with its quality level, plus test hole data sheets, so the designer and the contractor read the same picture.

Post your survey job
Choosing

How to choose an SUE provider

Three types of firm sell SUE. Large engineering and surveying firms run SUE departments for state transportation work. Specialist locating companies do the geophysics and often partner with a surveyor or engineer for the mapping. Regional land surveying firms do QL-C and QL-B as part of their topographic and ALTA surveys, and bring in a vacuum excavation subcontractor for QL-A.

For a private site the regional surveying firm is often the best value, because the utility map lands in the same coordinate system as the boundary and topography with no second firm to reconcile. For a road project a state agency is funding, check the agency SUE requirements first, since many expect the work to follow ASCE 38 and be certified by a licensed professional.

Whoever you hire, ask four things: which quality levels they deliver in house, what equipment they use for non-metallic pipe, who seals or certifies the utility map, and whether test hole data sheets are included in the price.

Checklist

What to gather before you ask for SUE quotes

Five items let the firms price the same scope, which is the only way the three numbers mean anything.

  • A limit of work on an aerial or site plan. The area or corridor to be designated, not the whole parcel unless you need it.
  • The quality level by area. For example QL-B across the building pad and parking, QL-A at the proposed storm crossing.
  • Existing records. Prior surveys, as-builts, utility owner maps and any old 811 tickets.
  • The design schedule. When the engineer needs the map, and whether field work has to happen at night or on weekends.
  • The CAD format and coordinate system. So the map drops into the design base without redrawing.
FAQ

Subsurface utility engineering questions

What is the difference between SUE and utility locating?

Utility locating finds and paints lines so someone can dig safely, and the marks wash away. SUE maps the lines into the design survey, assigns each one an ASCE 38 quality level and verifies key points with test holes, so the information supports design decisions and stays on file.

How much does subsurface utility engineering cost?

It is priced from crew days for QL-B designating, a unit price per QL-A test hole and office time for the map. Utility density, plastic pipe, traffic control and the number of test holes move it most. The federal benchmark puts QL-B and QL-A data at about 0.5 percent of construction cost.

Is SUE required on private projects?

Usually not by law. Public road agencies often require it on their projects. Private owners order it because a conflict found in design is far cheaper than one found in a trench, and a utility strike can stop a job for days.

Does 811 replace subsurface utility engineering?

No. 811 is a free notice so utility members mark their own lines before excavation. It does not mark private lines, does not give depths and is not a mapped design product. Call 811 before any digging, including SUE test holes.

When should SUE happen in a project?

Before or during preliminary design, after the boundary and topographic survey. QL-B early lets the engineer move the layout away from conflicts, and QL-A follows at the few crossings the design cannot avoid.

One scoped request beats six voicemails

Describe the parcel once. We pass your scoped request to surveyors who work your county as soon as they are available, and each one quotes it themselves. Posting is free for clients and quotes are never marked up.

Post your survey job